Customers: SK SZEM Contractors: X-Com Product: D-Link DGS-Series SwitchesSecond product: Supply of computer equipment Project date: 2021/01 - 2021/06
|
2021: Information System Development
On July 29, 2021, X-Com announced that it had completed the next stage of a large-scale project for the development of the information system of SK SZEM, a structural unit of CJSC Severzapenergomontazh Trust, specializing in the construction, reconstruction, modernization and repair of energy facilities. Dozens of workplaces are equipped with the necessary equipment, the capacity of the LAN has been increased.
To implement development plans, the company needed to significantly increase the number of jobs of the administration and design engineers. The project contractor was determined on the basis of an open tender, the participants of which were Russian system integrators and software and hardware suppliers. One of the conditions of the tender was the possibility of supplying computers that were castomized to the requirements of the customer. When evaluating competitive bids, along with the price proposal, the experience of candidates in implementing projects similar in scope and complexity was evaluated. X-Com offered the most financial and qualification-based conditions for the implementation of the project and was recognized as the winner.
Specifically for this project, the production department of X-Com manufactured computers on the basis of the processors Intel latest generation, accurately meeting the requirements used by software engineers and specialists of various profiles. The solution includes monitors Samsung F24T 350FHI. Continuous operation of equipment in unstable power supply conditions is maintained. uninterruptible power supplies APC In addition, a number of management workstations are equipped with laptops Lenovo V155-15API. For this equipment, additional PoE - are integrated into the local network of the enterprise. D-Link Switches DGS-1210-10P All necessary commissioning works have been completed.