RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

GK 1520 installed domestic digital automation at the Somovo station in Voronezh

Customers: South-Eastern Railway, Russian Railways

Product: Comprehensive Information Security Projects

Project date: 2022/07  - 2023/02

2023: Modernization of the control system at the Somovo station and the Somovo-Otrozhka stage

Specialists of the ZHAT GK 1520 Division modernized the train traffic control system at the Somovo station and the Somovo-Otrozhka section of the South-Eastern Railway. Imported components here were replaced with Russian digital equipment. The Group of Companies 1520 announced this on March 6, 2023.

The station has introduced a comprehensive cyber defense system (development and production of the ZHAT GK 1520 Division). This guarantees the information security of the object, protects against malware, and prevents cyber attacks.

Instead of an imported processor, a domestic processor of its own production was installed. The equipment is designed to manage large stations and entire sections of railways.

A modern auto-lock was installed on the Somovo - Otrozhka stretch.

Modernization will increase the safety and efficiency of transportation, simplify the diagnosis of pre-failure conditions, and reduce operating costs.

The Somovo railway station is located in the microdistrict of the same name in the city of Voronezh, receives both passenger and freight trains.