T8 solved problems of job order production through business process automation using a system Galaktika AMM

Customers: T8 OF STC

Product: Galaktika AMM (Advanced Manufacturing Management)
На базе: XAFARI

Project date: 2013/03  - 2014/09
Number of licenses: 15

T8 LLC solved the majority of problems of job order production through business process automation using the Galaktika Production Management system.

The T8 enterprise is among the most high-growth Russian hi-tech companies. Nevertheless, it was faced by the difficulties characteristic of all domestic industry: lack of the unified information environment of management, diverse automation equipment, labor-consuming manual planning of the production program, opacity of logistic accounting, deficit necessary and surplus of unnecessary component parts in warehouses. All this prevented operational and effective acceptance of management decisions.

Project Tasks

Solving of tasks demanded their localization, a view of the processes involved in production as on a system in general. During inspection of the enterprise by the staff of Galaktika corporation weak points which complicate were revealed or make impossible achievement of a main goal of the enterprise at all — generation of profit:

  • manual planning leads to impossibility of detailed assessment of feasibility of the production program in real time, to errors in planning, to lack of opportunities of the operational analysis of accomplishment of the new order at the existing loading of capacities;
  • large warehouse stocks of materials and work in progress which freeze cash assets. The high level of stocks at the enterprise is caused by opacity of material accounting and purchased components in own production and subcontracting, purchases not to term;
  • long terms of production of a product. The absence at the enterprise of a single system of product data management leads to failures to meet time constraints of deliveries because of not purchased or made component parts in time. Long completion dates are influenced by lack of the unified design-technology regulations. Data of need for any component even by several orders result in difficulties and a waste of time on search of all necessary documentation from the different systems sources.

Optimum to requirements of the job order enterprise there correspond the systems of synchronous planning which cornerstone the APS algorithm (Advanced Planning and Scheduling Algorithm) is. Galaktika AMM - Advanced Manufacturing Management — a modern information system which cornerstone this algorithm is.

Project Steps

Specialists of Galaktika implemented the project on system implementation at the T8 enterprise: carried out flexible configuration under needs of the customer, integrated a system with the applications which are already used at the enterprise, integrated all initial data in the unified information system.

"A system Galaktika AMM is a modern information tool which on the one hand adapts to production processes of the enterprise, and with another — does them "more harmonious". Thanks to the fact that all data are in one system and the sequence of actions on production became accurately regulated, it is possible to receive the analysis of the production program of all for working hour, it depends earlier it took the whole day. At what stage there is this or that order, production, what materials is how loaded and for what purchased — a system can answer all these and other questions". Denis Lyamshev, chief of the department of corporate projects.

Automation of production planning allowed to increase as much as possible efficiency of activity of the enterprise and to reduce costs. System implementation allowed to arrange production business processes and it is essential to reduce time, the spent accomplishment of managerial transactions.