Customers: Yugra regional electric grid company (YuRESK) Contractors: BCC Company Project date: 2014/03 - 2016/04
|
On January 30, 2015 the ARIA company announced a victory in tender and signing of the contract with the Yugra regional electric grid company (JSC YuRESK) on reconstruction of high-voltage substations of the region.
Project Tasks
The project is implemented within the program of reliability augmentation and controllability of power facilities of Khanty-Mansi Autonomous Okrug.
Office of JSC YuRESK company, 2013
Project Progress
Within the first stage of the project specialists of ARIA company booked power grid audit on 24 objects of JSC YuRESK, made an expert opinion in the field of telemechanization and communication and now start the second part – their reconstruction.
It is necessary to carry out work on seven substations of 35-220 kV, two of whom are located in Khanty-Mansiysk and five more — in Kondinsky district of the district. On each substation the ARIA company will perform mounting works and a commissioning of an automated system of supervisory control, will install and will unroll an end-to-end system of monitoring of quality and electricity metering and also will equip substations with modern monitors of a status of power facilities.
Is planned to connect substations to a digital network of JSC YuRESK, to perform a complex of works on information input of telemechanics on a supervisory console of command center networks of JSC YuRESK and on a dispatching board of Kondinsky branch.
Partners in the project expect that its implementation will help the management of JSC YuRESK to receive an objective picture of a status of networks of Khanty-Mansi Autonomous Okrug and to build management model assets.
Project Results
On August 9, 2016 the ARIA company announced end of the first stage of the project of upgrade of high-voltage substations of the Khanty-Mansi Autonomous Okrug (KMAO).
The created management system for power supply on the basis of the concept of Smart Grid allowed the Yugra regional electric grid company (JSC YuRESK) to increase reliability and status monitoring of the equipment and parameters of network.
Specialists of ARIA executed inspection and power grid audit on objects of YuRESK, design, supply of equipment and deployment of an end-to-end automated system of collecting, data transmission, monitoring of quality and electricity metering. At the first stage of the project of work four were conducted on seven substations of 35 - 110 kV, two of whom are located in Khanty-Mansiysk — in Kondinskom and one — in Nizhnevartovsk the areas of KhMAO.
The project was incredibly difficult, but interesting. The majority of works was conducted in remote hardly accessible districts of the district, in severe weather conditions. In total our specialists mounted about 200 items of equipment. The constructed system of collecting and information transfer gives the chance of JSC YuRESK of a message centralized operation and control of a status of the remote equipment, quickly reacting to non-staff situations. |
Smart Grid technologies are very relevant for program implementation, directed to energy saving. Especially it concerns regions with a big area and a territorial raznesennost of certain settlements. At the same time, in our country so far there are not a lot of companies whose competences allow to implement projects on implementation of Smart Grid technologies. We are grateful to specialists of ARIA company together with whom at the high level and in accurately stipulated terms all works on upgrade of substations were performed. Project implementation allowed us to raise a delivery quality of the electric power and to daily receive an objective picture about functioning of power facilities. |