Utilex of DPC DataStone + mobile

Product
The name of the base system (platform): Utilex of DPC DataStone (DPC in a corridor)
Developers: Utilex
Date of the premiere of the system: 2015/06/23
Branches: Government and social institutions,  Mineral extraction,  Telecommunication and communication
Technology: Data processing centers are technologies for DPC

To DPC of DataStone + mobile - the mobile DPC is intended for operational creation of the main or reserve DPC, including in the remote and hard-to-reach spots.

On June 23, 2015 the Utilex company announced an output to the market of development of DPC DataStone + mobile.

World Data Centres of DataStone + are focused by mobile on use:

  • law enforcement agencies as the mobile DPC suitable for transportation and consecutive installation in different places;
  • the companies of an oil and gas sector for creation and operational start in the remote and hardly accessible areas;
  • the state organizations and organizations as mobile reserve DPC;
  • telecommunication companies for fast deployment of network or accumulation of its power in a separate point;
  • organizers of mass actions.

DPC of DataStone + mobile, 2015


The enclosing structure of World Data Centres of DataStone + mobile represents the 40-foot warmed ISO container. All germovvoda are set in internal compartments of World Data Centres. DataStone construction + mobile prepared for transportation has no hatches, additional doors, openings and differs in nothing from a standard ISO container. It allows to transport World Data Centres as a standard container without additional costs.

Unlike "container" or pre-fabricated of World Data Centres which are not accepted for shipment on sea container carriers (except for bulk carriers) + mobile is suitable DataStone for transportation by any kind of transport – railway, the car and sea, it gives the chance to bring him to any region of the Russian Federation.

The bases for installation of technology equipment (racks under IT, conditioners and so forth) are executed using vibration-isolating materials and constructions. It allows to transport all engineering infrastructure of World Data Centres in the mounted status and to quickly start it within 1-2 days.

In World Data Centres three compartments:

  • autohall;
  • compartment for placement of condenser blocks
  • compartment for placement of the diesel generator set (DGS).

All compartments are separated by fire-prevention partitions.

In the autohall of World Data Centres the system of placement of the equipment on the basis of micro DPC of DataStone+ is installed. Can be its part from 1 to 6 racks. The maximum IT loading – 39 kW.

DataStone use + instead of standard racks allows to manage without platform gateway and, as a result, saves the place which can be used under placement of additional racks.

The mobile DPC is equipped with lighting systems, heating, the ACS, automatic installation of gas fire extinguishing (AUGPT) on the basis of Novec 1230, the system of trays under SCS, germovvoda of "ROXTEC", the transfer switch and DBU, a video surveillance system with the data warehouse for two weeks.

The conditioning system is constructed on the basis of line precision Clever Breeze conditioners of production of Utilex company.

The patented scheme of cooling at which only the condenser outside is located allows to use a system with the broad temperature range of external air.

Technical characteristics of a conditioning system:

  • air temperature in a cold corridor +22os (± 2 ° C);
  • temperature condition of work – from - 55 ° C to +45os;
  • humidity monitoring.

The system of uninterrupted power is placed in cabinets with the IT equipment. The maximum power – 72 kW. Reservation level – from N to 2N+1.

The built-in system of access control, management and monitoring is executed on the basis of Clever Breeze controllers and has functionality:

  • makes monitoring of temperature of cold and hot corridors;
  • analyzes a status and refrigerating capacity of conditioners;
  • monitors a status of uninterruptible power supply units and humidity in DPC;
  • performs functions of a control and management system for access;
  • traces history of events;
  • provides in a remote format via the web interface the image from video cameras of any format;
  • makes the SMS and e-mail of the notification about incidents.

Valentyn Foss, the marketing director and to sale of "Utilex", noted: "Application as the system of placement of the equipment in a container of DataStone allowed to eliminate a defect, standard for the majority of container solutions, – the shortage of service space. Besides, separation of a system of placement into three separate hermetic complexes significantly increased the level of vibration insulation of World Data Centres. This solution will be unconditional is demanded for the solution of operational tasks. However, for creation of DPC with smaller requirements for mobility we still recommend to use pre-fabricated DPCs, for example World Data Centres of NOTA".