[an error occurred while processing the directive]
RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Krasnoyarsk Station complex (Legrand PDU Series of blocks of power distribution)

Customers: Krasnoyarsk Station complex

Krasnoyarsk; Transport

Contractors: Legrand
Product: Legrand PDU Series of blocks of power distribution

Project date: 2018/04  - 2018/09

The Legrand group, the specialist in electrical and information systems of buildings, took part in upgrade of key city objects of Krasnoyarsk within preparation of infrastructure of the city for the XXIX World winter Universiade of 2019. The solutions Legrand were applied to reconstruction and construction of the body of the Krasnoyarsk edge clinical hospital and also the building of the railway station.

The station of Krasnoyarsk is the most important transport hub of the region including premises, necessary for passengers: waiting rooms, restrooms, points of a power supply and children's rooms. Within participation in preparation for the Universiade-2019 the Legrand company of Russia and CIS proposed the complete solution for technical retrofitting of the station of Krasnoyarsk. An object was equipped with uninterruptible power supply units of the ARCHIMOD HE series which, thanks to reliable architecture on the basis of single-phase power modules, guarantee power supply of life support systems of the building. The project was implemented by Legrand from a stage of formation of technical solution before successful carrying out commissioning.