NBI-Engineering conducted thermal tests of the turbine unit at the Arkhangelsk Pulp and Paper Mill TES-1

Customers: Arkhangelsk Pulp and Paper Mill (ACBK)

Contractors: NBI-Engineering
Product: Comprehensive Engineering Systems Projects

Project date: 2022/07  - 2023/02

2023: Thermal testing of turbine unit No. 7

On March 29, 2023, NBI-Engineering LLC announced that it had completed a project to conduct thermal tests of turbine unit No. 7 at the TES-1 of Arkhangelsk Pulp and Paper Mill JSC with the construction of energy characteristics.

Photo source: website of Arkhangelsk Pulp and Paper Mill JSC

The project was carried out in order to determine the actual state of the turbine unit and build the thermal characteristics necessary for the standardization and planning of equipment operation.

Within the framework of the project, the following tasks were completed:

  • thermal tests of turbine unit No. 7 were carried out;
  • energy characteristics have been developed;
  • reporting documentation has been developed.

Upon completion of the project, the Customer was provided with a technical report including the actual characteristics of the turbine plant operation, conclusions and recommendations on improving the efficiency of equipment operation.