Project

Ural Civil Aviation Plant (UZGA) (1C:ERP. Holding Management)

Customers: Ural Civil Aviation Plant (UZGA)

Yekaterinburg; Mechanical Engineering and Instrument Engineering

Contractors: Raytec DTG
Product: 1C:ERP. Holding management
Second product: 1C: Corporation

Project date: 2020/06  - 2022/04

2022

The key feature of the project was to automate the activities of the enterprise with a geographically distributed branch structure (4 divisions) without stopping activities.

The launch of the functional units was carried out in stages. This was achieved thanks to the development of integration mechanisms that allow the implementation of data exchange between "1C:ERP. Management of the holding "and information systems of the enterprise.

During the project, the following are combined into a single integrated information system 1C::. ERP Management of the holding,,, 1C:MDM Regulatory Reference Information Management 1C: Document Flow 1S:UPP. The integration is made by means of a bus. data

At the enterprise, 1800 jobs were automated as part of the project. Number of concurrent users:

  • "1C:ERP. Holding Management "- 1800
  • "1C: Document Flow" - 700
  • "1C: Manufacturing Enterprise Management" - 900

The number of local information systems (MS Access) is 13.