| Developers: | Exon (Anik Lab) |
| Last Release Date: | 2026/01/14 |
| Branches: | Construction and Construction Materials Industry |
| Technology: | BI, BPM, SaaS - Software as a Service, EDMS, Project Management Systems |
The main articles are:
- Business Process Management
- EDMS (more)
- Business Intelligence (BI)
- SaaS - History. Philosophy. Development drivers
2026: Organization of data transfer from BI Analytics module storage
The developers of the Exon construction management platform on January 14, 2026 presented large-scale updates that will allow customers to use analytics tools twice as efficiently. The development touched on two key areas: project analytics and direct access to data through the API. These updates give users an unprecedented level of control and flexibility in managing construction projects.
One of the major improvements was the organization of data transfer from the storage of the BI Analytics module. This fundamental change gives participating companies a whole new opportunity - self-dealing with data. Now, organizations no longer need to rely on standard reports to obtain documentation information from the Design and Survey Module (PID). After passing a simple authorization procedure through the Exon integration command, companies can directly upload raw data through the API.
This gives users a tool to create their own dashboards and reports that perfectly match their internal processes and requirements. This flexibility is especially valuable for large companies with a staff of analysts who can now directly transfer data from the Exon platform to their corporate systems and build exactly the graphs they need to make strategic decisions.
Another major refinement was the development of project analytics. Data visualization has now been added to the FIR and Stroycontrol directions. These dashboards turn disparate data into visual management tools that save time for managers and increase process transparency.
Visualization of data modulo FIR has been added to the design analysis. In each diagram, data detail is implemented with the ability to go to a specific cipher. Users can now instantly receive a holistic picture of the design and working documentation (PD and RD): from tracking the load of performers and identifying problem areas in coordination to monitoring compliance with the deadlines and quality of kits.
In terms of RD analytics, the following are implemented: Status model of RD sets received by the customer.
- Summary of contractors with the largest number of WD sets in operation.
- Display of WD sets with the largest deviation from the planned WBS date.
- Chart with the list of initiators with the highest average delay of VLOOKUP.
- Table with packages with the highest number of current comments.
In terms of PD analytics, the following are implemented:
- Status model of PD sets received by the customer.
- Diagram with PD sets, for which the results of the examination were obtained.
- Table with PD packages with the largest number of current comments.
As part of the project analytics, visualization of data modulo Stroycontrol was implemented. This enables managers to see the overall effectiveness of project construction controls in real time, track key indicators by month, and respond quickly to emerging issues.
The Stroycontrol analysis is a summary of the current results of the construction control in the context of the project, where the data are aggregated by participants and demonstrated over time by months. In addition, it is possible to group information on Comments, Inspections, Acts and Regulations with the possibility of detailing to a specific project.
{{quote "We move from providing standard reports to creating a flexible analytical environment. On the one hand, we give ready-made, "sharpened" tools for specific processes - dashboards for PIR and Stroykontrol, which immediately begin to benefit. On the other hand, we open data through the API, giving our customers the freedom to create their own unique graphs. Our immediate plans are to introduce project analytics in the form of dashboards for all modules, as well as expand the API for self-building analytics, "said Roman Solomatin, Head of WBS and Analytics at Exon. }}
2025: Integration with the Unified Digital Expertise Platform
The Exon construction project management platform and the Unified Digital Expertise Platform (ECPE) have been integrated. This step is aimed at creating a single data environment for all participants in the construction process. Exon (Anik Lab) announced this on November 24, 2025.
Integration will automate the transfer of data and documents between the review and construction processes, which will significantly reduce the time spent on coordinating design documentation and engineering surveys. Participants in the construction process will be able to manage both the coordination of the project through the ECPE and the construction process through the Exon digital platform in one window mode.
| The dynamic development of the ECPE, which celebrated its fifth anniversary in 2025, demonstrates the readiness of the construction market for deep digitalization. As of November 2025, more than 250,000 projects have already been uploaded to the platform, and the total number of users exceeds 78,000 people. Integration with Exon will become a logical continuation of the development of ECPE as the main tool for project management at the primary stage of the facility's life cycle, "said Alexander Perepelitsa, Deputy Head of the Center for Digital Transformation of the Glavgosexpertiza of Russia. |
Key benefits of integration:
- End-to-end digital flow: elimination of duplication data and manual input during transfer information from expertise to the construction stage.
- Shorten time: Accelerate processes through automated system-to-system interactions.
- Increased transparency: all project participants receive current status for each stage - from the conclusion of the examination to the progress of construction work.
- A single data environment: reducing the number of errors and forming a holistic digital history of the object.
| For Exon, partnership with ECPE is a strategic step that allows customers to start working with the project at the earliest, key stage, - said Denis Kolov, commercial director of the Exon platform. - We combine two digital circuits to enable the industry to manage the entire lifecycle of the construction site efficiently and without data loss. This is a new level of maturity for digital construction in Russia. |
The integration of ECPE and Exon is in the active phase of development. In parallel, work is underway at the ECPE to create a personal administrator's office, which will significantly increase the functionality of the platform.
