RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Charter

Company

width=200px

Content

Charter LLC provides services for the management of municipal solid waste and bulky garbage.

History

2024: Construction of a waste processing complex for 3.2 billion rubles

In July 2024, it became known that an innovative waste processing complex worth ₽3,2 billion was built in the Tula region. The facility, erected within the framework of the national project "Ecology," is at the final stage of commissioning.

A delegation led by Deputy Prime Minister Dmitry Patrushev and acting Governor of the Tula Region Dmitry Milyaev visited the new waste processing complex (KPO) of Charter LLC. The enterprise, built in record time, is equipped with advanced equipment for sorting and processing municipal solid waste (MSW).

source = "Charter"
An innovative waste processing complex was built in the Tula region for 3.2 billion rubles

The complex includes a waste sorting shop with an optical vision system and artificial intelligence, a hydraulic separation site and a non-contact polymer splitting shop. Innovative technologies allow processing up to 480 thousand tons of MSW annually, extracting up to 60% of secondary material resources.

File:Aquote1.png
The creation and subsequent replication of innovative KPO technologies in the regions will create a unique system for deep processing of MSW, as well as increase the Charter's own efficiency by optimizing technological processes, "said Alexey Kurtishvili, Executive Director of Charter LLC.
File:Aquote2.png

The peculiarity of the Tula KPO is that a significant part of the equipment is produced by the Charter company on the territory of the SEZ, Technopolice Moscow which contributes to the implementation of the import substitution program. In the future, it is planned to enter the Russian market for use in other processing complexes.

The commissioning of the KPO in Tula will create more than 500 new jobs and make a significant contribution to achieving the goals of the national project "Ecology." The complex is one of the largest and most technologically advanced facilities of this type in Russia.[1]

2021

In April 2021 Toole , testing of a new waste processing complex began on a specially created experimental site with an area of ​ ​ 42 hectares of one of the branches of the regional operator Charter. As the general director of the company said in an interview, in the Denis Galagan ecotechnopark "" Tula there are high-tech separators, storage areas for recyclable materials, areas for the processing of organic matter, hydraulic separation and contactless polymer splitting. The high-tech miracle was created by the joint efforts of scientists and the leadership of the Charter, which provides a full range of services for the management of municipal solid waste in five constituent entities of the Russian Federation. In fact, these are technologies of the future, allowing to extract useful components to the maximum for subsequent processing and energy generation. And the more such industries, the less anthropogenic impact from the activities of public utilities on the environment.

Notes