SO UES branch of JSC Interconnected dispatching office power supply systems of the East
Russia
Far Eastern Federal District of the Russian Federation
Khabarovsk
680000, Muravyev-Amursky St., 38.
The SO UES branch of JSC "Interconnected dispatching office power supply systems of the East" manages the modes of three power supply systems of CUC of the East located in the territory of five territorial subjects of the Russian Federation: Amur region, Seaside and Khabarovsk regions, Jewish Autonomous Region and also southern part of the Sakha (Yakutia) Republic.
Operational zone ODE of the East covers territorial subjects of the federation with an area of 4457.4 thousand sq.km the cities and settlements located in this territory 5.2 million people live. Integrated Energy System of the East 19 5 MW power plants also form above, electric substations of a class of voltage of 110-500 kV with a total power of 32.2 million kVA and a transmission line of 110-500 kV with a total length of 24,899.7 km. Total installed capacity of CUC of the East as of 3/1/2014 is 9.061 thousand MW.