Owners

+ Inter RAO UES, JSC

The second most powerful power plant of the Bashkir generation company after Karmanovsky state district power plant (and at the same time the most powerful among combined heat and power plant). Performs industrial and heating function, provides with heat about a half of Ufa and nearby industrial enterprises. Bears a name of Mukhammet Sultanovich Rezyapov – the organizer of construction and the head of CHPP-2 till 1957 (from 1957 to 1971 headed power supply system of the Republic of Bashkortostan). The first units are put into operation in 1940.

The set electric power – 519 MW, thermal – 1,528 Gcal/h The main fuel – natural gas, reserve – fuel oil.