[an error occurred while processing the directive]
RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Sitronics Electro: Electric Vehicle Charging Stations

Product
Developers: Sitronics Electro
Date of the premiere of the system: 2023/08/03
Last Release Date: 2024/03/26
Branches: Transport

Content

Main article: Electric filling stations (electric charging stations, ESS)

2024: Launch of serial production of slow stations

Russian electric charging infrastructure operator Sitronics Electro (part of Sitronics Group) has launched mass production of slow stations for electric vehicles. Sitronics announced this on March 26, 2024.

The operator offers different configuration options: the front panel can be made of metal or tempered glass, there are options for choosing the number of connectors and their standards, choosing the color of the indicators, as well as the type of fastening - in floor or wall design. The stations also suggest the possibility of complete customization in the customer's corporate style.

File:Aquote1.png
Demand for Russian-made charging equipment continues to grow. As of March 2024, pre-orders are issued for more than 100 stations. Buyers include owners of commercial real estate and from the HoReCa segment, developers and energy companies. In addition, there are requests for the purchase of stations for personal use, "said Nikolay Samokhin, commercial director of Sitronics Electro.
File:Aquote2.png

The operator announced the launch of the development of its own equipment for charging electric vehicles in the summer of 2023. The lineup will feature two types of stations - slow (AC) and fast (DC) - with a power of 22 to 150 kW. The design of the station was developed by Artemy Lebedev Studio. The company plans to present a prototype fast charging station in the summer.

2023

Assembly and testing of a pre-production sample of a slow charging station

The operator electric charging infrastructure Sitronics Electro (part Sitronics of the Group) has completed the assembly and testing of the first pre-production sample of the slow charging station. The Sitronics Group announced this on October 18, 2023.

Earlier, the operator announced the launch of a project to develop its own line of stations for charging electric vehicles. The lineup will feature two types of stations - slow (AC) and fast (DC) - with a power of 22 to 150 kW.

As part of testing the pre-production sample of the NPP station, IT specialists checked the interaction of the station with the server using the OCPP protocol, connecting the charging session through a mobile application and successfully charging the electric car.

The engineers also checked the station for compliance with the requirements for climatic design and checked for tightness and protection against dust and dirt (IP).

File:Aquote1.png
The demo sample passed the tests in our laboratory. In the near future, we plan to install a field testing station and open a pre-order, "said Andrey Gurlenov, executive director of Sitronics Electro.
File:Aquote2.png

Charging Station Development Plan

Charging infrastructure operator for electric transport Sitronics Electro (part of Sitronics Group) is launching a project to develop charging stations. Sitronics announced this on August 3, 2023.

The lineup will feature two types of stations - slow (AC) and fast (DC) - with a power of 22 to 150 kW. The operator plans to present the first slow-type station by the end of 2023.

File:Aquote1.png
The operator of the electric charging infrastructure, like no other, knows all the weaknesses and strengths of the ESS thanks to daily interaction with both manufacturers and users. We believe that in August 2023 we have accumulated enough expertise to create our own charging stations, and we expect the product to occupy high positions in the market, "said Andrey Gurlenov, CEO of Sitronics Electro.
File:Aquote2.png

Sitronics Electro specialists will be engaged in the inhouse development of the full cycle - controllers, software, power electrics, housing and layout of the station elements.