Customers: Republican Center for Infocommunication Technologies (RCIT) of the Republic of Sakha (Yakutia)
Contractors: GreenMDC (Green MDC), Accent Product: GreenMDC Modular Data CenterProject date: 2022/01 - 2022/02
|
2022: Tested FixedSized MDC StandardOutdoor24Ext
On March 31, 2022, the company GreenMDC announced that in February it conducted factory testing of a modular module data center manufactured for the RS (I) MBU "" Republican Information Technology Center(d.). Yakutsk The main feature of this M DPC is a wide range of operating temperatures of the engineering infrastructure from -60 to + 45 ° C, which is quite important for the regions of the Far North.
Russian modular manufacturer data centers GreenMDC has been developing the engineering infrastructure of regional centers since 2018. information technology At the end of March 2022, the company is conducting a project to develop to production and install the third modular data center within the framework of the project on digitalizations state structures and development of digital services for the population. World Data Centre was implemented in partnership with "" system integrator and Accent will be installed on the territory of the State Budgetary Institution of RS (I) "Republican Center information of Technologies."
Testing of the World Data Centre engineering infrastructure at the production site reduces the likelihood of emergency situations, significantly reduces the time of assembly and commissioning of the World Data Centre at the customer's site. Representatives of the administration of the Republic of Sakha (Yakutia) Anatoly Askalonovich Semenov, Minister of Innovation, Digital Development and Infocommunication Technologies, and Ivan Aleksandrovich Krivoshapkin , Director of the RCIT State Budgetary Institution (SCU), who confirmed the functioning of the systems in accordance with the technical requirements presented to the data center, also attended the testing of the ICOD engineering systems.
"Each World Data Centre produced by GreenMDC undergoes mandatory load testing of all engineering systems at 100% load in the presence of customer representatives. This allows you to test all World Data Centre systems in normal operation, check how the equipment will behave in emergency situations, as well as confirm the compliance of the finished solution with all technical characteristics before shipment to the installation site. Taking into account the special operating conditions of the World Data Centre, it was important for the customer to make sure that all utilities were operating before shipment. I am grateful to colleagues from the system integrator "Accent" and the State Budgetary Institution RS (I) "RCIT" that they entrusted the solution of such a difficult technological problem to us, "- |
{{quote 'author
= said Alexander Voznesensky, General Director of "Accent."|"For us, the delivery of GreenMDC World Data Centre for the State Budgetary Institution of RS (I)" Republican Center for Information Technologies "(Yakutsk) has become the logical completion of two years of work to select the optimal solution to provide a fault-tolerant infrastructure for the operation of state IT services. Many options were worked out, dozens of solutions were analyzed. As a result, our GreenMDC partners have offered a guaranteed working and cost-effective solution. All components from outdoor cameras and ambient lighting to precision air conditioning systems are certified and tested for operation at -
60 ° C.
Separately, it should be noted the speed of installation on the site - the assembly of the structural before the closure of the "warm circuit" took only 1 day, which is relevant at an outdoor temperature of - 30 ° С.
I would also like to draw attention to the high competence and involvement in the process of employees of the RS (I) RCIT State Budgetary Institution. All small tasks, from helping to find a subcontractor for civil works to organizing the possibility of large vehicles, were solved in a short time, at any time of the day and always with a 100% result.
I hope that this World Data Centre will become an example of an effective solution to the problems of placing IT equipment in rather harsh conditions and will allow other Russian customers to decide on the right choice of solution, "-}}
The FixedSized MDC StandardOutdoor24Ext is designed for 20 server 1200x600 mm racks with a total IT load of up to 150 kW. Cold supply system implemented on the basis of equipment: Stulz eight inter-row precision conditioners cooling capacity up to 25 kW each and two industrial cabinet cooling capacity up to 20 kW each. Uninterruptible power supply system is made on the basis of modular. UPS Huawei The battery life of engineering and IT equipment with a payload consumption of 150 kW is 10 minutes. MCOD engineering systems are reserved according to the N + 1 scheme.