RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

SIBUR South was started by VKS in an educational campus

Customers: KTsO SIBUR South

Anapa; Tourism, hotel and restaurant business

Contractors: Intact (Intakt)
Product: Cisco Identity Services Engine (ISE)
На базе: Cisco TrustSec
Project date: 2014/10  - 2015/12

Content

On March 18, 2015 it became known of end of the first stage of the project of the organization of a wireless network in the territory of the corporate center of improvement SIBUR South. The integrator is SMB Telecom.

Project Tasks

Within project implementation engineers of SMB Telecom were faced by a task: expand a complex of the hotel services provided to visitors of the corporate center for what the decision was made - to construct the safe, meeting all modern requirements system of wireless access.

Scenic platform SIBUR South, 2013

Project Progress

At a stage of preproject inspection specialists of SMB Telecom conducted a radioprospecting of the territory as a result of which they defined optimal quantity of access points and the place of their installation for providing qualitative service Wi-fi. On the basis of data retrieveds implementation of new services and services to guests of the center became possible.

For centralized operation by access points used series 2504 Cisco controller, for management and monitoring ‒ the Cisco Prime Infrastructure software product. For management of politicians of systems ‒ Identity Services Engine (ISE). All systems are unrolled on the hardware Cisco UCS server platform.

For ensuring secure access in the Internet series 5512X Cisco ASA firewall with a software module of ASA CX is used. Advantage of such solution - the deep analysis of traffic that helps to receive complex security. The flexible system of drawing up reports gives the chance to IT specialists to book security audit of network in the shortest possible time.

Project Results

The system of wireless access is implemented by the performed works, the basis for further expansion of a wireless network on KTsO complex objects is prepared.

"I am sincerely glad that KTsO "SIBUR South" became some of the first companies in holding who implemented at himself the qualitative Wi-Fi-solution meeting the highest standards of security and controllability", - Evgeny Lozhkin, the manager on information technologies of KTsO Sibur South LLC noted.
"The choice for benefit of the solution Cisco on the organization of wireless communication was caused not only thought more over integration with already existing infrastructure constructed on developments of this producer as well as the fact that, in my opinion, the Cisco company by right is the leader of a segment of the market of wireless communication", - Alexander Zykov, the chief executive of SMB Telecom emphasized.

Result of the first stage of the project

For centralized operation by access points used series 2504 Cisco controller, for management and monitoring ‒ the Cisco Prime Infrastructure software product. For management of politicians of systems ‒ Identity Services Engine (ISE).

Implementation was carried out within the complex project.

Result of the second stage

On March 22, 2016 the Intact company announced completion of installation of IT and audiovisions within construction of an educational campus based on the Corporate Center of Improvement the SIBUR-SOUTH[1].

Educational campus SIBUR South (2015)

The project is complete within one and a half months. The most part of works was performed at the same time with construction of a campus.

The INTACT company carried out tasks of design, installation and commissioning of a complex of technical means. Within the project installation of a management system for a complex of the multimedia systems, VKS systems and means of display of a video information is carried out. Systems are mounted:

  • microphone support and sound amplification,
  • congress system,
  • synchronous translation,
  • centralized operation of video and audioswitching.

The gateway AMX Enzo gives the chance to organize broadcast of content per Wi-fi network from mobile gadgets and notebooks. Interactive lesson schedules and a possibility of carrying out video conferences with removed participants will help with organization of events. Guests of a campus will be able to work jointly on documents using the SmartBridgit server on 500 clients and to take part in collective work with the help of interactive LCD panels. Management of IT systems is centralized.

Notes