Bashkir copper
Russia
Ural Federal District of the Russian Federation
Volga Federal District of the Russian Federation
Owners:
Ural Mining and Metallurgical Company (UMMC)
2018
879 thousand tons of ore were mined at the deposits developed by Bashkir Copper LLC, which is 140% of the plan.
The processing plant processed 1181 thousand tons of ore, produced 68844 tons of copper concentrate, the amount of copper in the concentrate is 11944 tons. Zinc concentrate produced 11734 tons, the amount of zinc in the concentrate 4943 tons.
At the underground mine of the Yubileynoye field under construction, 5582 m of mine workings were completed over the year.
In 2018, Bashkir Copper LLC took the next steps in the development of the subsoil of the Yubileynoye deposit, and the development of the Dergamyshsky deposit of copper-calcined ores was completed. A considerable amount of work was carried out on the construction of an underground mine at the Yubileynoye field, and the main fan unit was put into operation during pilot operation. The construction of above-shakht structures of the Southern Ventilation Shaft of the mine continues. Reinforcement work is underway at the Skipo-Kletev shaft, a grinding and laying complex is being built. Preparation for drilling works on the North Vent Hole is being carried out.
In connection with the planned expansion of production in 2019 and an increase in the number of personnel in the rotation camp, two hostels are being built with 100 beds each.