Roselectronics completed the reconstruction of the Yarag-Kazmalyar checkpoint on the border with Azerbaijan

Customers: Rosgranstroy, FSU - Federal State State Institution Directorate for the Construction and Operation of Rosgranitsa Facilities

Moscow; Construction and industry of construction materials

Product: Comprehensive Engineering Systems Projects

Project date: 2023/05  - 2023/11

2023: Reconstruction of Yarag-Kazmalyar automobile checkpoint

Holding Roselectronics State Corporation Rostec completed the reconstruction of the Yarag-Kazmalyar automobile checkpoint across state the border and. Russia Azerbaijan This made it possible to increase the throughput by 3 times and ensure the passage of up to 1870 transport funds per day. The opening took place in the teleconference mode with participation. Minister of Transport of the Russian Federation Vitaly Savelyev This was announced by Roselectronics on December 29, 2023.

The opening was also attended by the acting Head of the Federal Customs Service Ruslan Davydov, Chairman of the Government of the Republic of Dagestan Abdulmuslimov Abdulmuslim, Deputy Head of FGKU Rosgranstroy Georgy Budaev, as well as the General Director of the United Instrument-Making Corporation (managing organization of the Roselectronics holding) Sergey Sakhnenko.

File:Aquote1.png
The implementation of the reconstruction project made it possible to increase the throughput capacity in terms of freight transport by more than 2 times at Yarag-Kazmalyar. The number of lanes rose from 14 to 22. I note that in 2023 we set a record for the number of missed trucks - more than 200 thousand trucks, which is 10% more than in 2022, - Vitaly Savelyev emphasized.
File:Aquote2.png

As part of the contract with FGKU Rosgranstroy Roselectronics, more than 60 title buildings and structures were built and reconstructed, 13.5 km of external engineering networks were laid, and high-tech equipment was installed.

File:Aquote1.png
The implementation of reconstruction projects has become a certain challenge for us. We had to lead construction in difficult conditions. We did not close the checkpoints for a single day. Dozens of buildings and structures were built, equipped with equipment and provided comfortable conditions for all participants in international communication, "said Gennady Bezlobenko, head of FGKU Rosgranstroy.
File:Aquote2.png

File:Aquote1.png
Yarag-Kazmalyar is the busiest automobile checkpoint on the border with Azerbaijan. As a result of the work carried out, we managed to gradually, even before the completion of the project, significantly increase the volume of transport passes and create a high-quality border infrastructure for the development of tourist and commodity ties, - said Sergey Sakhnenko.
File:Aquote2.png