MES of Western Siberia
Russia
Siberian Federal District of the Russian Federation
Ural Federal District of the Russian Federation
Surgut
628406, Geologicheskaya St., 4
Owners
Trunk power grids of Western Siberia service the power grid objects located in the territory of the Tyumen region, Khanty-Mansi Autonomous Okrug and the Yamalo-Nenets Autonomous Area.
Assets
Four main power networks company (MPNC) are under operational supervision of MES of Western Siberia.
In operation of MES of Western Siberia there are 83 substations of 220-500 kV with a total transformer capacity about 35,296 MVA.
History
Trunk power grids of Western Siberia perform the activity in the territory of the Tyumen region with a total area of 1435.2 thousand sq.km, strategically important for Russia, with the population over 3.2 million people. On October 1, 2005 the branch accepted on service the first 4 thousand km of transmission lines and 14 substations, and by January, 2006 – 67 more substations and 6573 km of the lines relating to the Single national (all-Russian) electric network (ENES).
Total length of transmission lines on MES of Western Siberia is 13,134 km. Total number of personnel of MES of Western Siberia more than 1800 people.