RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Catherine II Krasnodar International Airport

Company

width=200px

Owners:
Basel Aero

Owners

+ Changi Airports International

Krasnodar International Airport named after Catherine II (Pashkovsky) was formed as part of the Krasnodar United Air Squad in 1932. It is the largest airport in the south of Russia, ranks 9th among Russian airports in terms of the number of passengers transported. As a result of the reconstruction of the runway, from 2017 it can serve up to 14 runway operations per hour and aircraft types such as Boeing 767, Airbus A321, Airbus A330.

2024: Construction of a new terminal for 60 billion rubles

A new terminal will be built at the Krasnodar airport for 60 billion rubles. The press service of the air harbor announced this on October 11, 2024.

By this date, the readiness of the new terminal is 30% - work is being completed on the construction of a monolithic frame of a three-story building, a metal frame of the future roof is being erected. In parallel with this, work is being carried out on the arrangement of external engineering networks: transformer substations, a boiler room are being built, water disposal tanks are being built.

2020

About 300 million rubles invested in the design of a new terminal of Krasnodar airport

About 300 million rubles were invested in the design of a new terminal at Krasnodar airport, TASS reported in June.

Financing is carried out at the expense of own funds of the air harbor. The work should be completed in 2021. Commissioning of the facility is scheduled for December 2023.

After the launch of the transport hub, the airport's capacity will more than double and reach 27 thousand passengers per day.

The design documentation provides for the construction of a terminal, including administrative buildings, office, storage facilities, a new cargo terminal, parking lots and engineering infrastructure. The contractor was Spectrum-Holding LLC.

In addition, an agreement was reached with the government of the Krasnodar Territory on the construction of a regional highway. It will connect the territory of the new airport complex with the Temryuk - Krasnodar - Kropotkin highway.

The construction of the new terminal of Krasnodar International Airport will begin in the spring of 2021

The main work on the construction of a new airport terminal in Krasnodar will begin in the spring of 2021, and commissioning is expected in December 2023. After the launch of the transport hub, the airport's capacity will more than double and reach 27 thousand passengers per day, Vitaly Korenyugin, an official representative of Krasnodar International Airport, told TASS in the summer of 2020.

File:Aquote1.png
"The zero construction cycle will begin this year. The main construction work will start in the spring of 2021 and will last until mid-2023, "Korenyugin said.
File:Aquote2.png

He clarified that from the fall of 2023 it is planned to use the terminal in test mode, and full commissioning is planned in December 2023. Thanks to him, the skipping ability of the terminal will more than double - from 14 thousand to 27 thousand passengers per day.

According to him, the volume of investments required for the full implementation of the project for the development of Krasnodar International Airport, including the construction of an airport terminal and infrastructure facilities, will amount to about 25 billion rubles.

File:Aquote1.png
"At the moment, a master plan has been developed, design work has begun, the architectural concept of the airport is being chosen. To speed up the process of implementing the Basel Aero project, at the expense of Krasnodar Airport (130 million rubles), I began to develop design estimates for federal facilities, "the airport representative said.
File:Aquote2.png

2019

Company logo until 2020

At the end of 2019, passenger traffic amounted to 4.6 million people. The airport is managed by Basel Aero, which also includes Anapa and Sochi airports.

In December 2019, it was reported that the new terminal, with an area of ​ ​ 75 thousand square meters. m will be equipped with ten telescopic traps. In addition to the terminal, the complex will include objects of the service and technical territory of the new airport. These are service buildings, repair shops, warehouses, garages. In addition, there are plans to build taxiways and an apron that provides parking for 21 aircraft at the same time. It is also planned to build a new road of regional importance. It will connect the territory of the new airport complex with the Temryuk-Krasnodar-Kropotkin highway.

2018

In February 2018, the authorities of the Krasnodar Territory, Krasnodar and Basel Aero at the Russian Investment Forum in Sochi signed a protocol on the implementation of the airport development project until 2022. It was planned to build a new airport terminal, forecourt, freight and VIP terminals, a pedestrian gallery, short and long-term parking lots.